Showing posts with label Construction. Show all posts
Showing posts with label Construction. Show all posts

Saturday, 23 January 2016

First Draft Of Tour Poster

This was the first draft of my poster. Initially, I was pleased with the general design concept; the image and the presence of tour dates, but there was clear feedback on certain aspects.

Friday, 22 January 2016

Problems Encountered

It took three filming sessions in order to get all of the shots I needed. One problem that I faced was the availability of my performance actress, in that I had only one evening in which to capture all of the lip synching. This situation was helped by the fact that I was only filming in one location, however it meant that both myself and the model had to be well organised. Another problem which lead on from this was the facts that Maria kept tripping up on the lyrics, in order to deal with this and ensure that we did not waste too much time, I got the lyrics up on a laptop screen and made sure they were easily readable and only during the shots where she wasn't looking at the camera.